These additional trains are being procured to support the two newly approved metro corridors. Each train will consist of three coaches
Vous n'êtes pas connecté
These additional trains are being procured to support the two newly approved metro corridors. Each train will consist of three coaches
These additional trains are being procured to support the two newly approved metro corridors. Each train will consist of three coaches
The two corridors are extensions of the existing Vanaz–Ramwadi Line (Phase-1) and aim to improve east-west connectivity across the city
The two corridors are extensions of the existing Vanaz–Ramwadi Line (Phase-1) and aim to improve east-west connectivity across the city
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, pending safety...
The Union Cabinet has approved the extension of Pune Metro Line 2. The project will cost approximately Rs 3,626 crore. Currently, 33.3 kilometres of...
After more than three years and multiple rounds of public engagement, the City of Vancouver has finalized its new Rupert and Renfrew Station Area...
After more than three years and multiple rounds of public engagement, the City of Vancouver has finalized its new Rupert and Renfrew Station Area...
These 2 elevated corridors will span 12.75km and include 13 stations connecting suburbs such as Chandani Chowk, Bavdhan, Kothrud, Kharadi, and Wagholi
These 2 elevated corridors will span 12.75km and include 13 stations connecting suburbs such as Chandani Chowk, Bavdhan, Kothrud, Kharadi, and Wagholi