The entire 508 km corridor of Mumbai-Ahmedabad Bullet Train Project is being developed with Japanese Shinkansen technology.
Vous n'êtes pas connecté
The Railways Ministry has dismissed as baseless and misleading some reports claiming that India has decided not to run the Japanese bullet train on the Mumbai-Ahmedabad route.
The entire 508 km corridor of Mumbai-Ahmedabad Bullet Train Project is being developed with Japanese Shinkansen technology.
Egypt’s Health Ministry on Sunday dismissed social media reports claiming four siblings died simultaneously from meningitis. ......
The Mumbai-Ahmedabad bullet train project achieved a significant milestone with the completion of the Daman Ganga River bridge in Gujarat's Valsad...
The Ningo Traditional Council has dismissed claims that a supposed Igbo king in Ghana has established a new kingdom within the Old Ningo area,...
Beijing has dismissed reports of missile defense shipments to Iran, calling the claims “false and misleading.” China denies reports of supplying...
Beijing has dismissed reports of missile defense shipments to Iran, calling the claims “false and misleading.” China denies reports of supplying...
The linking initiative is a part of the larger multi-modal integration (MMI) aiming to connect the Mumbai High Speed Rail (HSR) station on the...
The Ministry of Tourism and Antiquities confirmed on Saturday that the King Farouk Corner Museum in Helwan is completely safe and unaffected by any...