MCD has completed biomining at Singhola, clearing 800,000 tonnes of waste and reclaiming 7.2 acres for controlled silt disposal, aiding sustainable...
Vous n'êtes pas connecté
MCD has completed biomining at Singhola, clearing 800,000 tonnes of waste and reclaiming 7.2 acres for controlled silt disposal, aiding sustainable waste management.
MCD has completed biomining at Singhola, clearing 800,000 tonnes of waste and reclaiming 7.2 acres for controlled silt disposal, aiding sustainable...
The firms – two public sector undertakings (PSUs) and a private company – had been instructed to install closed-circuit television (CCTV) cameras...
Currently, the MCD processes around 8,100 tonnes of waste at four WtE plants, while 4,360 tonnes of waste end up at Bhalswa and Ghazipur landfills,...
Mohali generates over 150 tonnes of waste daily, while the current waste management contract only covers 100 tonnes; as a result, garbage piles are...
Mohali generates over 150 tonnes of waste daily, while the current waste management contract only covers 100 tonnes; as a result, garbage piles are...
The facility has been described as a cornerstone of the country's vision for a secure and sustainable energy future
Bisleri International Pvt. Ltd., signs Letter of Agreement with St. Joseph's University, Bengaluru to introduce its flagship initiative, 'Bottles for...
Bisleri International Pvt. Ltd., signs Letter of Agreement with St. Joseph's University, Bengaluru to introduce its flagship initiative, 'Bottles for...
A path of destruction has been cut through a rural settlement in Motueka Valley, with one local blaming slash, saying "thousands of tonnes of logs and...
The Economic Commission has approved allocation of 2,000 acres of land at the Abu Nasr Farahi port for unloading, loading vehicles and related...