X

Vous n'êtes pas connecté

Maroc Maroc - HINDUSTANTIMES.COM - Chandigarh News - 04/01/2025 17:36

Ludhiana: Fog-triggered snags disrupt power supply

According to officials, the Ludhiana central zone of the Punjab State Power Corporation Limited (PSPCL) received over 6,963 complaints on Friday regarding the outages, primarily caused by technical faults triggered by fog

Articles similaires

Ludhiana: PSPCL faces flak as rural areas under prolonged power cuts

hindustantimes.com - 27/Apr 01:20

PSPCL chief engineer (central zone) Jagdev Singh Hans says efforts are underway to streamline the supply; necessary steps are being taken to manage...

Ludhiana: PSPCL faces flak as rural areas under prolonged power cuts

hindustantimes.com - 27/Apr 01:20

PSPCL chief engineer (central zone) Jagdev Singh Hans says efforts are underway to streamline the supply; necessary steps are being taken to manage...

Maintenance work to disrupt power supply in Ludhiana

hindustantimes.com - 23/Apr 00:42

Supply will remain disrupted between 10 am and 5 pm in most affected areas, while some localities will face outages from 9 am

Punjab: Facing public heat, PSPCL caps planned power cuts at 4 hours

hindustantimes.com - 23/Apr 22:28

Citing the sudden rise in temperature and the need to provide relief to the public, PSPCL has restricted outages to four hours daily

Punjab: Facing public heat, PSPCL caps planned power cuts at 4 hours

hindustantimes.com - 23/Apr 22:28

Citing the sudden rise in temperature and the need to provide relief to the public, PSPCL has restricted outages to four hours daily

Power demand outpaces supply in Ludhiana by up to 2,000 MW; rural, suburban areas face frequent outages

hindustantimes.com - 25/Apr 00:22

To manage the deficit, the department is relying on hydro generation from Ranjit Sagar Dam, contributing around 600 MW during peak hours

Power demand outpaces supply in Ludhiana by up to 2,000 MW; rural, suburban areas face frequent outages

hindustantimes.com - 25/Apr 00:22

To manage the deficit, the department is relying on hydro generation from Ranjit Sagar Dam, contributing around 600 MW during peak hours

PSPCL’s infra upgrade drive to trigger outages across major cities

hindustantimes.com - 23/Apr 00:10

The maintenance work will impact residential, commercial, and industrial hubs in several areas, including Patiala, Amritsar, Ludhiana, Jalandhar,...

PSPCL’s infra upgrade drive to trigger outages across major cities

hindustantimes.com - 23/Apr 00:10

The maintenance work will impact residential, commercial, and industrial hubs in several areas, including Patiala, Amritsar, Ludhiana, Jalandhar,...

Watt a relief! Mohali’s power struggles are almost over

hindustantimes.com - 25/Apr 02:16

PSPCL deputy chief engineer (East zone, distribution circle) Harpreet Singh Oberoi said most work under the state’s ‘Roshan Punjab’ programme...