X

Vous n'êtes pas connecté

  - LESTIMES.COM - A la Une - 03/Jul 15:43

‘Phapano illegally suspended Mokuoane

—PAC declares PS overstepped his mandate Mohloai Mpesi   THE Public Accounts Committee (PAC) has concluded that the February 2025 suspension of Mokheseng Mokuoane, Project Manager for the Lesotho Renewable Energy and Energy Access Project (LREEAP), was unlawful.  Principal Secretary (PS) of the Ministry of Energy, Tankiso Phapano suspended Mr Mokuoane, whose Project Implementing Unit […]

Articles similaires

Sorry! Image not available at this time

LEC spent M6m on incompatible meters

lestimes.com - 30/Jun 10:43

  …PAC orders their return Mohloai Mpesi THE Public Accounts Committee (PAC) has ordered the Lesotho Electricity Company (LEC) to return meters...

Sorry! Image not available at this time

LEC spent M6m on incompatible meters

lestimes.com - 30/Jun 10:43

  …PAC orders their return Mohloai Mpesi THE Public Accounts Committee (PAC) has ordered the Lesotho Electricity Company (LEC) to return meters...

Sorry! Image not available at this time

LEC cable supplier confirmed “legitimate”

lestimes.com - 30/Jun 10:29

  …as PAC appears to be playing to the gallery Mohloai Mpesi IN a bizarre twist to the Lesotho Electricity Company (LEC) procurement controversy,...

Sorry! Image not available at this time

LEC cable supplier confirmed “legitimate”

lestimes.com - 30/Jun 10:29

  …as PAC appears to be playing to the gallery Mohloai Mpesi IN a bizarre twist to the Lesotho Electricity Company (LEC) procurement controversy,...

Sorry! Image not available at this time

Lipholo disrespected Royal Family: Police

lestimes.com - 03/Jul 18:20

Mohloai Mpesi  THE Basotho Covenant Movement (BCM) leader, Dr Tšepo Lipholo, is facing charges of incitement, provocation of peace, and contempt for...

Sorry! Image not available at this time

World Bank Sanctions $173.5 Million Loan for Azerbaijan Renewable Energy Project

azerbaijannewsgazette.com - 01/Jul 00:00

Baku: Today, a loan agreement on the Azerbaijan Scaling-Up Renewable Energy Project (AZURE) was signed between 'AzerEnergy' OJSC and the International...

Sorry! Image not available at this time

World Bank Sanctions $173.5 Million Loan for Azerbaijan Renewable Energy Project

azerbaijannewsgazette.com - 01/Jul 00:00

Baku: Today, a loan agreement on the Azerbaijan Scaling-Up Renewable Energy Project (AZURE) was signed between 'AzerEnergy' OJSC and the International...

ACME Solar marks dual milestone- 300 MW in Rajasthan, 50 MW in Gujarat; clean energy base expands

times of india - 24/Jun 10:50

ACME Solar Holdings has fully commissioned its 300 MW Sikar Solar Project in Rajasthan, boosting its operational renewable energy capacity to 2,890...

Sorry! Image not available at this time

LEC buys M13m equipment at odds with system

thepost.co.ls - 01/Jul 10:13

MASERU – THE Lesotho Electricity Company (LEC) bought metres, keypads and transformers that are incompatible with the company’s system at a...

Sorry! Image not available at this time

Tempers flare in parliament

thepost.co.ls - 01/Jul 09:44

MASERU – TENSIONS flared on Monday after a Public Accounts Committee (PAC) member, Thabiso Lekitla, accused the Lesotho Electricity Company (LEC)...

Les derniers communiqués

  • Aucun élément