X

Vous n'êtes pas connecté

  - NST.COM.MY - A La Une - 01/Jul 06:30

Onn Hafiz: RTS Link achieves 50 per cent physical progress

JOHOR BARU: The Johor Bahru-Singapore Rapid Transit System (RTS) Link project has achieved 56 per cent physical progress as of June.

Articles similaires

Sorry! Image not available at this time

Onn Hafiz: RTS Link achieves 50 per cent physical progress

nst.com.my - 01/Jul 06:30

JOHOR BARU: The Johor Bahru-Singapore Rapid Transit System (RTS) Link project has achieved 56 per cent physical progress as of June.

RTS Link Train Design Officially Revealed to the Public

thecekodok.com - 01/Jul 11:09

The Rapid Transit System Link (RTS Link) project, which will be the new link between Johor Bahru and Singapore, has been officially unveiled to the...

Sorry! Image not available at this time

Loke: RTS Link will strengthen Malaysia-Singapore relationship

nst.com.my - 30/Jun 17:35

SINGAPORE: The Johor Baru-Singapore Rapid Transit System (RTS) Link is not merely a transportation infrastructure project but a symbol of renewed...

Sorry! Image not available at this time

Loke: RTS Link will strengthen Malaysia-Singapore relationship

nst.com.my - 30/Jun 17:35

SINGAPORE: The Johor Baru-Singapore Rapid Transit System (RTS) Link is not merely a transportation infrastructure project but a symbol of renewed...

JS-SEZ, RTS link to boost Johor property market

thestar.com.my - 30/Jun 16:00

JOHOR BARU: Johor's property market is expected to enter a new phase of growth following the signing of the Johor-Singapore Special Economic Zone...

Sorry! Image not available at this time

Over 42,000 VEP tags for Singapore vehicles still inactive as of June 29 — RTD

nst.com.my - 01/Jul 08:20

JOHOR BARU: A total of 42,416, or 17.07 per cent, of Vehicle Entry Permit (VEP) tags for individual private vehicles registered in Singapore had yet...

Sorry! Image not available at this time

Over 42,000 VEP tags for Singapore vehicles still inactive as of June 29 — RTD

nst.com.my - 01/Jul 08:20

JOHOR BARU: A total of 42,416, or 17.07 per cent, of Vehicle Entry Permit (VEP) tags for individual private vehicles registered in Singapore had yet...

Jalan Ismail Sultan heading to Stulang route closed nightly until July 16

thestar.com.my - 03/Jul 09:13

JOHOR BARU: The route from Jalan Ismail Sultan heading towards Stulang will be fully closed to all vehicles every night until July 16 to allow...

Jalan Ismail Sultan heading to Stulang route closed nightly until July 16

thestar.com.my - 03/Jul 09:13

JOHOR BARU: The route from Jalan Ismail Sultan heading towards Stulang will be fully closed to all vehicles every night until July 16 to allow...

Sorry! Image not available at this time

Gamuda awards Hitachi Rail contract for CBTC system, SCADA solutions in Taiwan MRT project

nst.com.my - 03/Jul 20:03

KUALA LUMPUR: Gamuda Bhd, the main contractor for the New Taipei City government’s Department of Rapid Transit Systems (NTCG DORTS), has awarded...

Les derniers communiqués

  • Aucun élément