Transport Minister Barbara Creecy has hailed the R4.5 billion project to construct a new 3.9 km section of the Huguenot Tunnel on the N1 national...
Vous n'êtes pas connecté
A contract has been awarded to rebuild a stretch of hinterland road that was significantly damaged by wild weather. Hazell Bros will oversee the reconstruction of part of Schreibers Road at Cooran. It represents the last major recovery project after parts of the region were flooded in 2022. An existing culvert will be replaced by a […]
Transport Minister Barbara Creecy has hailed the R4.5 billion project to construct a new 3.9 km section of the Huguenot Tunnel on the N1 national...
It will take three months to finish the repair work from the date of handing over the contract. The announcement comes after repeated complaints by...
THE Office of Procurement Regulation (OPR) has ordered the National Insurance Property Development Company Ltd (Nipdec) to terminate the...
The Zimbabwean government, in partnership with the City of Harare, has awarded Masimba Holdings Limited a US$200,000 contract to construct a temporary...
DOF Group ASA announced a Substantial Contract with an international oil company for the PSV Skandi Feistein. The vessel will continue with the...
Road work will close the part of the street between Ainslie Street and Park Hill Road East
Minister of Works Dave Umahi recently confirmed that the 63-kilometer stretch of the Calabar-Lagos Coastal Highway in Ondo State will be officially...
A section of the Junction main road in St Andrew is now blocked by huge boulders as part of a massive landslide, which occurred sometime this...
ADC Energy has been awarded a contract that will see ADC Energy playing a pivotal role in the selection and acceptance of up to three offshore...
Thomas Partey displayed another impressive performance for Arsenal in the Premier League, despite suffering a narrow defeat against Newcastle...