Queensland LNP to combine treasurer and energy minister role, as it moves quickly to stop work on giant pumped hydro project. The post Queensland LNP...
Vous n'êtes pas connecté
Lake BorumbaThe Borumba Pumped Hydro Project is entering its next stage, with Queensland Hydro awarding three major works packages totalling almost $190 […] The post Milestone for Qld pumped hydro appeared first on Energy Magazine.
Queensland LNP to combine treasurer and energy minister role, as it moves quickly to stop work on giant pumped hydro project. The post Queensland LNP...
A report says a scrapped pumped hydro scheme proposed by the former Queensland government had no value for money, with costs blowing out to almost $37...
ANU’s RE100 Group has published global atlases of about 800,000 potential pumped hydro sites.
The new Queensland government says it is investigating opportunities to build multiple smaller, more manageable pumped hydro projects after formally...
Bizarre proposal to use 3D printed concrete spheres in a sub-sea pumped storage project wins backing from US and German governments. The post US and...
The state-of-the-art-facility opened in July 2024. Images: TAFE Queensland.A new TAFE Queensland training facility is changing the game in renewable...
Collie Battery Stage 1. Image: Neoen. The Collie Battery Stage 1 has reached a key milestone, delivering its first grid capacity services to the...
BlueFloat Energy announced its Gippsland Dawn offshore wind project has secured major project status (MPS) from the Australian government.
The works are to demolish the existing stadium and structures on the site.
Image: Ian Hitchcock/shutterstock.com.Powerlink has requested community feedback on its newly released transmission corridor as part of the grid...