Noida Airport aims to start commercial operations by April 2025 after initial test flights from September. The airport, owned by Zurich Airport, will...
Vous n'êtes pas connecté
According to a master plan, during the 2021-2030 period, Cát Bi International Airport will be classified as a 4E airport (according to ICAO standards) and a level 1 military airport, with a capacity of approximately 13 million passengers per year and 250,000 tonnes of cargo per year.
Noida Airport aims to start commercial operations by April 2025 after initial test flights from September. The airport, owned by Zurich Airport, will...
Brazilian soybean exports are expected to reach 5.6 million tonnes in September, up 1.4% versus the 5.5 million tonnes exported in the same period a...
Vietnam is aiming to increase the export value of wood and wood products to US$20 billion by 2025 and US$25 billion by 2030 under the national...
The proposed project, with a capacity of 12 million metric tonnes per annum, is expected to bring significant investment to Prayagraj, while also...
The proposed project, with a capacity of 12 million metric tonnes per annum, is expected to bring significant investment to Prayagraj, while also...
Dublin Airport is only allowed to fly through a maximum of 32 million passengers a year based on planning conditions from 15 years ago.
Dublin Airport is only allowed to fly through a maximum of 32 million passengers a year based on planning conditions from 15 years ago.
Nigerian striker Victor Osimhen will earn a net annual salary of €6 million during his one-year loan spell at Galatasaray, as announced by the...
The Republic of Italy, a country rich in history, culture, and art, is facing a severe demographic crisis that threatens its long-term political and...
Andújar I, Andújar II and Andújar III represent an investment of more than 60 million euros and will generate more than 700 direct and indirect...