Six persons were injured in the incident, which took place in the factory located in the Naushera area under Shikohabad police station limits.
Vous n'êtes pas connecté
The BAIC vehicle manufacturing plant located in the Eastern Cape was hit by many setbacks in the eight years it took to build, and its future is looking murky.
Six persons were injured in the incident, which took place in the factory located in the Naushera area under Shikohabad police station limits.
Introduction Ghana stands at a pivotal point in its economic history. Known as one of West Africa’s most vibrant economies, the country has made...
By Alex Willemyns Ahead of November’s U.S. presidential election, trade with China has emerged as a major area of policy disagreement between...
The Sahel region of north Africa may be understood as “one region, many crises.” This statement is taken from a paper first published in 2013 by...
In recent years, the Middle East has been the crown jewel of the Chinese diplomatic front, where in April 2023, China was able to facilitate a...
South Africa’s power utility Eskom has issued a tender to operate a 19.5MW solar PV plant to be established within the Sere Wind Farm. The winning...
Looking for the latest Build a Factory codes to increase productivity quickly? Then you’ve come to the right place. In Roblox, Build a Factory...
By Catherine Tan (FPRI) -- In October 2022, the Biden administration introduced export controls to limit China’s access to advanced US...
China's strategic muscle-flexing is not limited to its expansive maritime claims and vigorous infrastructure exports; Chinese entities has also been...
China's strategic muscle-flexing is not limited to its expansive maritime claims and vigorous infrastructure exports; Chinese entities has also been...