Eskom has now reached more than nine months without having to implement load shedding. Are you impressed - or shocked?
Vous n'êtes pas connecté
An energy expert has warned that even if Eskom sustained its generation improvement in 2025, it was far too early to call an end to load-shedding. The power cuts could return for one very simple reason.
Eskom has now reached more than nine months without having to implement load shedding. Are you impressed - or shocked?
John Williams kept a backpack filled with everything he’d need to go on the run: three pairs of socks; a few hundred dollars cash; makeshift...
The Long-Term Operation (LTO) programme was designed to extend Unit 2’s operational lifespan by an additional 20 years.
Egyptian Finance Minister Ahmed Kouchouk announced that Egypt will not witness a return to load shedding for 2025. Kouchouk assured that there will be...
By Zhou Chao Since the beginning of Donald Trump's first term, the U.S. government has continuously ramped up pressure on China's advanced...
Eskom has revealed that it’s saving on diesel costs year-on-year to the tune of more than R16 billion, reports Cape {town} Etc. According to a...
History will remember this era as the moment when America’s most sacred principles collided with unprecedented institutional power – and lost....
It’s been a while since we’ve had Mr. Arithmetic here, but with Donald Trump coming back to the White House, we may need him around. The...
In this episode, military expert Frank Ledwidge joins us to discuss the game-changing role of F-16s and Mirage aircraft in Ukraine, the evolving...
The term, ‘conspiracy theory’ became part of common parlance during the ‘Covid era,’ but although all of us know what it refers to – and...