Vestas has received a firm order from First Look Solutions, a subsidiary of Rezolv Energy and Low Carbon, to deliver a full engineering, procurement,...
Vous n'êtes pas connecté
Vestas has received a firm order from First Look Solutions, a subsidiary of Rezolv Energy and Low Carbon, to deliver a complete engineering, procurement and construction (EPC) solution for the 192 MW Vifor wind farm in southeastern Romania. The order includes 30 V162-6.2 MW wind turbines from the EnVentus platform operating in 6.4 MW operational … Continue reading Vestas to deliver 192 MW turnkey wind energy EPC project in Romania →
Vestas has received a firm order from First Look Solutions, a subsidiary of Rezolv Energy and Low Carbon, to deliver a full engineering, procurement,...
The renewable energy company Elawan Energy – Grupo Orix has placed an order for 50 MW for several wind projects in Spain. The contract includes the...
Vestas has received an order for 155 MW for the second stage of Mercury Energy’s Kaiwera Downs wind farm in New Zealand. The order includes the...
Renewable power company Elawan Energy – Grupo Orix has placed a 50 MW order for several wind projects in Spain. Vestas has installed over 5.3 GW of...
The operating group orders eleven N163/6.X wind turbines. Order intake on the German market has once again developed well for the Nordex Group. More...
GE Vernova Inc. has announced that delivery is underway for 88 of its 2.8 MW-127 m workhorse wind turbines for Puget Sound Energy’s (PSE) Beaver...
Strengthening the existing relationship with TagEnergy, Vestas has been awarded the Engineering, Procurement, and Construction (EPC) for the second...
Funded with €2.9 million by ADEME as part of France 2030 (a French State Investment Plan) and in response to the DEMO Tase call for projects, the...
Vestas has received a 155 MW order for the second stage of the Mercury Energy’s Kaiwera Downs wind farm in New Zealand. This project builds on the...
Vestas has secured a contract from Vattenfall and BASF to supply its 112 V236-15.0 MW wind turbines for Nordlicht 1 and 2 projects.