The event featured nearly 350 residents from all age groups, participating in parallel 6 km and 3 km cyclothons and a 2 km walkathon.
Vous n'êtes pas connecté
Maroc - HINDUSTANTIMES.COM - Cities - 19/Jan 23:34
The clean air action plan flags 726 km of damaged roads, with most narrow stretches under MCG slated for phased repair costing over ₹700 crore.
The event featured nearly 350 residents from all age groups, participating in parallel 6 km and 3 km cyclothons and a 2 km walkathon.
The event featured nearly 350 residents from all age groups, participating in parallel 6 km and 3 km cyclothons and a 2 km walkathon.
Gurugram plans to cut air pollution by 10% by 2026, implementing a multi-phase action plan focusing on public transport and road management.
Works cover sewer line rehabilitation, stormwater drains, RMC roads, drinking water, lighting and sanitation across wards, sectors, villages and new...
Works cover sewer line rehabilitation, stormwater drains, RMC roads, drinking water, lighting and sanitation across wards, sectors, villages and new...
Locals cite waterlogging after brief rain, illegal dumping, unsafe pedestrian access and rising commute costs, with authorities promising phased...
Locals cite waterlogging after brief rain, illegal dumping, unsafe pedestrian access and rising commute costs, with authorities promising phased...
The participants formed a human chain and demanded the development and completion of 24-metre sector roads, connecting various high-rises across all...
Chairing the board meeting, chief minister Rekha Gupta directed officials to prioritise the repair of damaged roads, drainage systems, and...
Chairing the board meeting, chief minister Rekha Gupta directed officials to prioritise the repair of damaged roads, drainage systems, and...