The first phase of a manufacturing hub in Egypt is set for completion by September 2025, to establish a 2GW solar cell production line.
Vous n'êtes pas connecté
The directive aims to enhance California’s grid storage by up to 2GW and increase energy production by up to 8.6GW.
The first phase of a manufacturing hub in Egypt is set for completion by September 2025, to establish a 2GW solar cell production line.
Tenders for long duration energy storage and a spot in the South West Renewable Energy Zone have left NSW spoiled for choice on the best projects to...
Tenders for long duration energy storage and a spot in the South West Renewable Energy Zone have left NSW spoiled for choice on the best projects to...
On August 30, Azerbaijan’s Minister of Finance Samir Sharifov participated in a panel discussion titled “Middle Corridor: Reshaping the Euro-Asia...
On August 30, Azerbaijan’s Minister of Finance Samir Sharifov participated in a panel discussion titled “Middle Corridor: Reshaping the Euro-Asia...
The Beijing Summit and Ninth Ministerial Conference of the Forum on China-Africa Cooperation (FOCAC), held from September 4 to 6, 2024, marked a new...
AdEnergy Solutions Ltd (AESL) acquired the Khavda Phase IV Part-A transmission project, demonstrating its leadership in India’s energy transition....
AdEnergy Solutions Ltd (AESL) acquired the Khavda Phase IV Part-A transmission project, demonstrating its leadership in India’s energy transition....
An abalone farm in Romansbaai is now able to meet its energy needs with 30% clean energy supply thanks to the installation of an SPS micro-grid.
The European Union has taken a significant step forward with the introduction of the NIS2 Directive. This directive, which builds upon the original...