The Government of Malawi has received financing from the African Development Bank toward the cost of the SADC Sub Regional Transport and Trade...
Vous n'êtes pas connecté
Contracting of Consultancy Services for a period of 17 months, to carry out the feasibility study of the future 220 KV electricity transmission project between the cities of Gove and Menongue
The Government of Malawi has received financing from the African Development Bank toward the cost of the SADC Sub Regional Transport and Trade...
The Government of Malawi has received financing from the African Development Bank toward the cost of the SADC Sub Regional Transport and Trade...
The study is intended to evaluate the practicality and potential success of the proposed project. It aims at identifying potential challenges,...
SLB has announced the award of a contract by TotalEnergies to its OneSubsea joint venture for a 13-well Subsea Production System scope, including...
Madinet Masr (code MASR.CA), one of Egypt’s leading real estate developers, signed a Memorandum of Understanding (MoU) with Aboelwafa Contracting...
The Government of Malawi has received financing from the African Development Bank toward the cost of the SADC Sub Regional Transport and Trade...
Thales Alenia Space, the joint venture between Thales (67%) and Leonardo (33%), today announced the promising results of the ASCEND (Advanced Space...
Following a call for tender, Vallourec, a world leader in premium tubular solutions, announces that it has been awarded a contract by TotalEnergies to...
The proposal to install solar panels in Barangay Sambag 2 has been scrutinized anew by the Cebu City Council for lack of feasibility study from the...
Thales Alenia Space, the joint venture between Thales (67%) and Leonardo (33%), has announced the promising results of the ASCEND (Advanced Space...