X

Vous n'êtes pas connecté

Maroc Maroc - INQUINTE.CA - A La Une - 12/Sep 23:34

Traffic & pedestrian disruptions on Elizabeth St (Picton) Sep 15

McCumber Painting will be working on the building exterior of 173 Picton Main St starting on Monday, Sep 15. Work will take place over the next several weeks between the hours of 7am and 7pm. Traffic and pedestrian disruptions are expected on Elizabeth St during this time. Three parking spaces around the building will be unavailable to the public during work hours as they will be occupied with moving trucks and contractor vehicles. Traffic control will be present. Motorists and pedestrians are asked to avoid the construction area and travel alternate routes, if possible. Heavy equipment may limit visibility in the...

Articles similaires

Sorry! Image not available at this time

Water trunk construction to impact Belleville St traffic and Wellington bulk water station Sep 25

inquinte.ca - 18/Sep 16:56

The installation of a water trunk main connection in Wellington will impact traffic on Belleville St on Thursday, Sep 25. In addition, the bulk water...

Sorry! Image not available at this time

Water trunk construction to impact Belleville St traffic and Wellington bulk water station Sep 25

inquinte.ca - 18/Sep 16:56

The installation of a water trunk main connection in Wellington will impact traffic on Belleville St on Thursday, Sep 25. In addition, the bulk water...

Sorry! Image not available at this time

Traffic disruptions in the County next week

inquinte.ca - 19/Sep 20:21

There will be a number of traffic disruptions in Prince Edward County next week. Sep 22: Bloomfield Main St Contractors retained by the County will be...

Sorry! Image not available at this time

Watermain flushing & hydrant maintenance Sep 15-19 in Picton

inquinte.ca - 12/Sep 19:22

The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2, in the Picton Drinking Water System. The watermain flushing...

Sorry! Image not available at this time

Watermain flushing & hydrant maintenance Sep 15-19 in Picton

inquinte.ca - 12/Sep 19:22

The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2, in the Picton Drinking Water System. The watermain flushing...

Sorry! Image not available at this time

Temporary traffic disruptions for Take Back the Night Sep 25

inquinte.ca - 24/Sep 21:48

There will be temporary traffic disruptions along the route in what's pictured for the Take Back the night march tomorrow night (Sep 25) from 6pm to...

Sorry! Image not available at this time

Temporary traffic disruptions for Take Back the Night Sep 25

inquinte.ca - 24/Sep 21:48

There will be temporary traffic disruptions along the route in what's pictured for the Take Back the night march tomorrow night (Sep 25) from 6pm to...

Sorry! Image not available at this time

Watermain flushing & hydrant maintenance (Picton) Sep 22-26

inquinte.ca - 20/Sep 09:22

The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2 in the Picton Drinking Water System. The watermain flushing...

Sorry! Image not available at this time

Portion of Front St parking lot, sidewalk closed Sep 28

inquinte.ca - 25/Sep 16:25

Elexicon will be completing work by the Front St Parking Lot across from City Hall on Sunday, Sep 28. The north portion of the parking lot will be...

Sorry! Image not available at this time

Portion of Front St parking lot, sidewalk closed Sep 28

inquinte.ca - 25/Sep 16:25

Elexicon will be completing work by the Front St Parking Lot across from City Hall on Sunday, Sep 28. The north portion of the parking lot will be...