The installation of a water trunk main connection in Wellington will impact traffic on Belleville St on Thursday, Sep 25. In addition, the bulk water...
Vous n'êtes pas connecté
McCumber Painting will be working on the building exterior of 173 Picton Main St starting on Monday, Sep 15. Work will take place over the next several weeks between the hours of 7am and 7pm. Traffic and pedestrian disruptions are expected on Elizabeth St during this time. Three parking spaces around the building will be unavailable to the public during work hours as they will be occupied with moving trucks and contractor vehicles. Traffic control will be present. Motorists and pedestrians are asked to avoid the construction area and travel alternate routes, if possible. Heavy equipment may limit visibility in the...
The installation of a water trunk main connection in Wellington will impact traffic on Belleville St on Thursday, Sep 25. In addition, the bulk water...
The installation of a water trunk main connection in Wellington will impact traffic on Belleville St on Thursday, Sep 25. In addition, the bulk water...
There will be a number of traffic disruptions in Prince Edward County next week. Sep 22: Bloomfield Main St Contractors retained by the County will be...
The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2, in the Picton Drinking Water System. The watermain flushing...
The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2, in the Picton Drinking Water System. The watermain flushing...
There will be temporary traffic disruptions along the route in what's pictured for the Take Back the night march tomorrow night (Sep 25) from 6pm to...
There will be temporary traffic disruptions along the route in what's pictured for the Take Back the night march tomorrow night (Sep 25) from 6pm to...
The County's watermain flushing and hydrant maintenance program began on Tuesday, Sep 2 in the Picton Drinking Water System. The watermain flushing...
Elexicon will be completing work by the Front St Parking Lot across from City Hall on Sunday, Sep 28. The north portion of the parking lot will be...
Elexicon will be completing work by the Front St Parking Lot across from City Hall on Sunday, Sep 28. The north portion of the parking lot will be...