A 15-metre tall research buoy has been launched into the ocean off Perth to help NASA's new mission to capture ocean secrets from space.
Vous n'êtes pas connecté
ANSTO’s OPAL research reactor at Lucas Heights in Sydney has recommenced operations following a months-long planned shutdown to carry out essential maintenance and upgrades. Central to these upgrades was the elaborate replacement of OPAL’s cold neutron source, located next to the reactor core. The three-metre-tall device slows down neutrons as they travel from the OPAL… The post OPAL reactor running after maintenance shutdown appeared first on Australian Manufacturing Forum.
A 15-metre tall research buoy has been launched into the ocean off Perth to help NASA's new mission to capture ocean secrets from space.
A 15-metre tall research buoy has been launched into the ocean off Perth to help NASA's new mission to capture ocean secrets from space.
Important repairs to the structural support columns on the pool decks at Western Financial Place, which started last week are moving ahead as planned....
A four-metre-tall sculpture of a crow unveiled in a Chatham park Thursday is the "first of many" destination sculptures coming to Chatham-Kent.
The man says he got a frosty reception from his daughter after her device was entombed in ice.
The City of Cape Town’s Water and Sanitation Directorate has launched an accelerated project to rehabilitate over 2000 metres of ageing sewer pipes...
Errors in aircraft maintenance and inspection processes can cause aircraft-systems failures in flight, resulting sometimes in catastrophic...
After a time when the brand was known for a variety of productions running all the way from the Brio hatchback to the Accord sedan, Honda Cars India...
Auckland Transport and Metlink are replacing all trains with buses until Tuesday for maintenance and upgrades.
Picture Perfect Landscaping Quinte Ltd. has made a substantial donation to the services needed for upgrades and maintenance work to be completed at...