The renewable energy company Elawan Energy – Grupo Orix has placed an order for 50 MW for several wind projects in Spain. The contract includes the...
Vous n'êtes pas connecté
Renewable power company Elawan Energy – Grupo Orix has placed a 50 MW order for several wind projects in Spain. Vestas has installed over 5.3 GW of wind energy across more than 140 wind parks in Spain since installing the first turbine in 1991.
The renewable energy company Elawan Energy – Grupo Orix has placed an order for 50 MW for several wind projects in Spain. The contract includes the...
Renewable energy producer African Clean Energy Developments (ACED) has placed an order for 144 MW for the Umsinde Emoyeni wind farm, which will be...
Danish wind turbine maker Vestas has secured a 144MW wind turbine order from the African Clean Energy Developments (ACED).
Vestas has received an order for 155 MW for the second stage of Mercury Energy’s Kaiwera Downs wind farm in New Zealand. The order includes the...
Plenitude inaugurated Wednesday in Torrejoncillo del Rey (Cuenca, Spain), at the presence of Castilla-La Mancha, the Town Council and company’s...
Vestas has received a 114 MW order from SAB WindTeam for the Ahlum-Dettum wind energy project in Lower Saxony, Germany. Vestas will deliver 17...
Strengthening the existing relationship with TagEnergy, Vestas has been awarded the Engineering, Procurement, and Construction (EPC) for the second...
Nordex has received an order from Aquila Clean Energy for 123.9 MW in Spain. Starting in summer 2025, the Nordex Group will supply and install 21...
Vestas has received a 155 MW order for the second stage of the Mercury Energy’s Kaiwera Downs wind farm in New Zealand. This project builds on the...
The first wind turbine has successfully been installed at the German offshore wind farm Borkum Riffgrund 3. With an installed capacity of...