The three-member Gas-to-Energy (GtE) arbitration team presiding over the US$50 million dispute between the Government of Guyana and project...
Vous n'êtes pas connecté
Kaieteur News – Lindsayca and CH4, the joint venture that was awarded the contract to construct the onshore facilities for the Gas-to-Energy (GTE) project in collaboration with the Ministry of Natural Resources recently facilitated a two day tour of the construction site for the 40 participants of the Youths in Natural Resources Apprenticeship Program. In […]
The three-member Gas-to-Energy (GtE) arbitration team presiding over the US$50 million dispute between the Government of Guyana and project...
The three-member Gas-to-Energy (GtE) arbitration team presiding over the US$50 million dispute between the Government of Guyana and project...
…Team to visit next month Kaieteur News – The arbitration panel for US-million cost overruns claimed by United States-based Lindsayca and CH4...
…Team to visit next month Kaieteur News – The arbitration panel for US-million cost overruns claimed by United States-based Lindsayca and CH4...
MINISTER of Natural Resources Vickram Bharrat says the Gas-to-Energy (GTE) project, currently underway, will significantly bolster the country’s...
ABUJA, Sept 6 — Nigeria’s oil regulator has awarded UTM Offshore Limited the first-ever license to operate a floating liquefied natural gas...
Hecate Energy has chosen Bechtel to spearhead the design and construction of its Sunfish Solar 2 project in Calhoun County, Michigan.
WorldStage Newsonline– The Federal Government of Nigeria has granted UTM Offshore Limited a ‘Licence to Construct’ (LTC) a 2.8 million...
WorldStage Newsonline– The Federal Government of Nigeria has granted UTM Offshore Limited a ‘Licence to Construct’ (LTC) a 2.8 million...
Strike Energy, as operator of the EP469/L25 Joint Venture, which includes the West Erregulla gas field, has announced multiple successful gas...