The Staff Groups of the Volta River Authority (VRA) have voiced their opposition to a draft bill proposing the merger of VRA with the Bui Power...
Vous n'êtes pas connecté
In the early 1990s, the Volta River Authority (VRA) began conducting feasibility studies on potential hydro sites in the White, Black, and Oti River Basins. It was in the White Volta Basin that the concept for the Pwalugu Dam was conceived. In 2013, there was a renewed effort to advance the construction of the Pwalugu …
The Staff Groups of the Volta River Authority (VRA) have voiced their opposition to a draft bill proposing the merger of VRA with the Bui Power...
The Staff Groups of the Volta River Authority (VRA) have voiced their opposition to a draft bill proposing the merger of VRA with the Bui Power...
The Department of Public Works and Highways, in partnership with the Asian Development Bank , is preparing a comprehensive flood risk management...
Senior staff of the Volta River Authority (VRA), together with members of the Public Services Workers Union (PSWU) under the Trades Union Congress...
Senior staff of the Volta River Authority (VRA), together with members of the Public Services Workers Union (PSWU) under the Trades Union Congress...
SAO PAULO, (Reuters) – Soil moisture in Brazil’s main river basins used for hydropower generation has fallen to nearly two-decade lows, data...
SAO PAULO, (Reuters) – Soil moisture in Brazil’s main river basins used for hydropower generation has fallen to nearly two-decade lows, data...
Malaysia's first floating solar farm is located in Manjung Perak and is operated by TNB Genco. Now another floating solar farm will be built in Lake...
Makisha’s Disappearance On September 16, a 16-year-old girl named Makisha was reported missing, sparking concern and urgency within her community....
Makisha’s Disappearance On September 16, a 16-year-old girl named Makisha was reported missing, sparking concern and urgency within her community....